Don’t get locked into an existing building footprint

Frank Melo • May 22, 2023

Pre-engineered steel buildings offer adaptable engineering to allow you to quickly and affordably expand the size of your existing structure.

Companies love ground-breaking ceremonies where executives grab a ceremonial shovel and dig out the first scoop of dirt. It’s a significant photographic moment that gets published often. It’s because buildings are such a valuable investment that provides huge financial and operational strength to an organization. As companies grow, they can quickly outgrow the property as it is design and must make the difficult choice to either relocate or build new.


Fortunately, modern engineering provides a more cost effective and less disruptive alternative. With pre-engineered steel building design, once operational and storage needs outgrow their current space, the building can be quickly and affordably expanded using adaptative load-bearing end walls. The usable length of the building can be increased by extending into any available land. This building modification is not as easily possible with traditional building materials like timber or brick and mortar. Versatile metal buildings ensure your company is prepared to adjust to meet future capacity.

Endless expandability: Your building can grow with your company

Need more warehousing space? Would an extra bay to receive additional deliveries expand your capacity? Our metal structures offer clients the flexibility to scale and modify their existing footprint as business grows over time. No need to get locked into a permanent building capacity that becomes outdated and compromises your effectiveness. Change it, expand it without interrupting your workflow. Only steel buildings are so versatile.


One of the advantages of metal structures is how quickly they can be revised to expand with your growing business. The first step in planning the future growth of your building is to make sure at least one end is built with load-bearing expandable rigid-frame end wall joints. End walls are where your metal roof panels run into a supporting wall. You will also hear this referred to as a high eave parapet. Some end walls are fixed, while others can be built to allow future expansion. With the expandable options in place, future sections can be added easily. You’ll never be locked into a final steel building design or size. Modular steel framing design means expansion is never expensive. 


Your building is not limited by length. Summit Steel Buildings can make your building as long as your site location, budget and imagination allow. If you anticipate needing more space in the future, our engineering teams can plan for future expansion by adding more framing bays at one or both ends and creating load-bearing end ways to make future additions quick and easy.


Read our case study on the FCMP Outdoor building expansion.


  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button


Expandable rigid-frame end walls are the smarter choice

Of the three basic types of end walls used in pre-engineered metal buildings – post-and-beam, non-expandable rigid frame, and expandable rigid frame – only the latter will allow your building to grow to meet future business needs. Modular pre-engineering is the most cost-effective means to ensure you don’t need to interrupt your business operations to move to larger location: additional building capacity can be added without interfering with current building use. 


An expandable end wall allows for adding more framing to the structure later by using heavier rigid steel I-beam columns and rafters like the rest of the primary framing. However, the end wall is engineered to carry the load of half the adjoining bay in the current construction, plus another half-bay if extended in the future. This means future framing does not require two end walls. The new metal building framing simply attaches to the existing end wall to save you engineering time and money.


If you’re wondering if this type of engineering means doors and openings have to be located at the very end, it’s not the case. The expandable end wall system allows doors or openings to be “field-located”, or later relocated, as needed. You have a choice between overhead doors or shipping and receiving doors on any of the three sides and can switch between one type to the other if needs change. Expandable end walls provide flexibility in the layout and use of your building. The necessary doorway bracing does not need load-bearing posts or even to be completely enclosed. For instance, horse riding areas, storage sheds or aircraft hangars might not even need closed ends. Expandable metal frame walls can be designed up to 150’ in width can support the heavy weight of glass if that design option is chosen, as in having a storefront.

Plan for future expansion

When designing your metal construction, consider future expansion needs and future capacity needs. Your original pre-engineered steel building should include expandable framing so you’re able to quickly and affordably expand the ends of your building as needed without shoring up purlins and grits. Pre-engineering’s intelligent end wall designs lets you save considerably over rebuilding and make expansion more quickly and without interruption.


When you’re ready to build a building that is ready and capable of meeting your current and future needs, contact Summit Steel Buildings by email at info@summitsteelbuildings.com  or at 877-417-8335 and we'll provide you with a free consultation, quote and preliminary drawings.

 


About the author

Frank Melo has a construction civil engineering technology and business background with over 25 years of experience as a business owner and contractor. He was born and educated in London, Ontario and now divides his time between projects primarily in Ontario and British Columbia. He can be contacted at Summit Steel Buildings at (778) 951-4766 or by email at frank.melo@summitsteelbuildings.com or through LinkedIn.

Get durable building engineering to protect against heavy snow
By Frank Melo December 9, 2025
Rely on Summit Steel Buildings to supply structures designed for northern climates. Get the precise engineering design to handle heavy snowfalls.
Architects and their clients can rely on pre-engineered building solutions for incredible designs
By Frank Melo November 24, 2025
Architects can transform bold commercial concepts into buildable reality with the power of pre-engineered systems.
Custom-designed structures from Summit Steel Buildings are engineered around your business.
By Darren Sperling November 18, 2025
Capital investment into facilities and infrastructure is a smart way to invest into the growth of your business.
Clients are best served by using components and building systems manufactured in their own country.
By Darren Sperling November 6, 2025
The advantages when you use domestic manufacturing from Summit Steel Buildings.
Underground photo of mining operations with miner and equipment
By Darren Sperling October 30, 2025
Capital Projects in Mining Gets Boost with CIM Sponsorship from Summit Steel Buildings.
Modern distribution facilities demand engineering that balances clear-span efficiency
By Darren Sperling October 22, 2025
Metal buildings offer the expendable engineering that help businesses keep up with growing consumer demand for product inventory.
Large warehouses are critical infrastructure for Canadian business.
By Darren Sperling October 14, 2025
An overview of Canada’s booming logistics sector and the pre-engineered metal buildings that make it possible.
Skilled tradesman installs metal framing on new industrial building.
By Frank Melo September 25, 2025
Modular steel construction for new facilities minimizes on-site risks and keeps projects moving so operations are completed without costly injuries or delays.
Pre-engineered steel buildings are ideally suited for golf courses
September 17, 2025
When golf courses need more space, they count on our construction team to deliver a building solution that’s affordable and always under par on performance.
Summit Steel Buildings' new office features a nice client sitting area.
By Frank Melo August 12, 2025
Summit Steel Buildings marks a milestone with its new sales and administration office for the Ontario region located outside London.