Building case study: FCMP Outdoor

March 4, 2022

Thorndale lawn and garden product manufacturer meets sales demand with new steel building.

FCMP Outdoor, also known as Forest City Models and Patterns, has a strong brand reputation for designing and manufacturing some of the lawn and garden market’s best products in their respective categories. From concept to design, manufacturing to fulfillment, FCMP Outdoor offers both stock and custom programs for most of their outdoor items. As a result of sales growth, the company recently commissioned a new steel building facility to address warehousing and administration space constraints they were experiencing.


The Canadian company has been a preferred partner to some of the leading retailers for in-store and e-commerce globally, including Home Depot, Canadian Tire, Home Hardware, Costco and Amazon. The company’s 37-gallon tumbling composter has received over 10,000 positive reviews and a 4.5-star overall rating, making it the most popular choice on Amazon. The composter, reviewers point out, is well-made from BPA-free, UV-inhibited materials, offers quality aeration, and can make compost in as little as two weeks if placed in the right environment. Ease of use and affordability contribute to its exceptional ranking.



Located near London, Ontario, in the hamlet of Thorndale, FCMP Outdoor has been in operation for over 40 years, employing approximately 25 people. The company has significant sales presence in the U.S. market (approximately 80%), with Canada and international partnerships rounding out their business. With the impact of the COVID-19 pandemic, one of the major economic shifts was an increase in home improvement and do-it-yourself initiatives. The correlating result of more North Americans staying home was an uptick in sales for FCMP – and a need for additional warehousing space.


To meet demand, FCMP Outdoor began planning a new build project with Summit Steel Buildings to erect an approximate 35,000-square-foot warehouse alongside their current building. The plan will also provide FCMP with added flexibility for internal space efficiencies, with the addition of a mezzanine and enhanced workflow mapping.


Summit Steel Buildings is well known to FCMP Outdoor; they had previously built the office, manufacturing and warehousing space at the company’s Thorndale location. Suitable leasing properties in the area were minimal, so with available property on site, expanding using a new steel structure made sense. This will allow FCMP to meet increasing consumer demand for their products and grow the overall footprint of their Thorndale operations. The familiarity with the benefits of a pre-engineered steel building supported the decision. Working with steel is generally 30% less than the price of traditional construction and takes about as third as long to complete, allowing FCMP to utilize the new space more quickly.


The turnkey advantage was cited as a significant factor in FCMP Outdoor’s decision to build. Summit Steel Buildings even manages the pre-construction process, from organizing quotes to permits and engineering planning. The real benefit of have a single unified team managing the various phases from planning to ribbon-cutting is the cost savings of less labour, faster production and build time. It also means less headaches because of the confidence a well-managed process can bring. 


Take a video tour through the FCMP Outdoor facility.


  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button


Summit Steel Buildings’ structures are constructed from heavy industrial I-beams and steel roof and wall systems with various architectural profiles shipped directly to the building site. Industry estimates suggest construction times are slashed by up to 33% and have lower materials costs with pre-engineered systems. Summit Steel Buildings offers a wide array of different profiles and color schemes to meet their customers’ individual needs. These cold-formed steel buildings systems produce less waste, allow for easier installation and provide tighter seals to avoid leaks. Computer-aided design (CAD) and Building Information Modeling (BIM) aid in the production of flexible steel construction, allowing much of the labour to be done off-site, making on-site assembly more straightforward. These savings in time and materials are passed along to the client.


The FCMP Outdoor expansion project broke ground once the frost was gone in the spring of 2022. Read about the building addition (one of two since the original building was finished) and see construction photos.


View the Case Study (PDF)

About the author

Cameron Wood is an award-winning communications professional with over 30-years experience in journalism and corporate communications. He can be contacted through LinkedIn.

Get durable building engineering to protect against heavy snow
By Frank Melo December 9, 2025
Rely on Summit Steel Buildings to supply structures designed for northern climates. Get the precise engineering design to handle heavy snowfalls.
Architects and their clients can rely on pre-engineered building solutions for incredible designs
By Frank Melo November 24, 2025
Architects can transform bold commercial concepts into buildable reality with the power of pre-engineered systems.
Custom-designed structures from Summit Steel Buildings are engineered around your business.
By Darren Sperling November 18, 2025
Capital investment into facilities and infrastructure is a smart way to invest into the growth of your business.
Clients are best served by using components and building systems manufactured in their own country.
By Darren Sperling November 6, 2025
The advantages when you use domestic manufacturing from Summit Steel Buildings.
Underground photo of mining operations with miner and equipment
By Darren Sperling October 30, 2025
Capital Projects in Mining Gets Boost with CIM Sponsorship from Summit Steel Buildings.
Modern distribution facilities demand engineering that balances clear-span efficiency
By Darren Sperling October 22, 2025
Metal buildings offer the expendable engineering that help businesses keep up with growing consumer demand for product inventory.
Large warehouses are critical infrastructure for Canadian business.
By Darren Sperling October 14, 2025
An overview of Canada’s booming logistics sector and the pre-engineered metal buildings that make it possible.
Skilled tradesman installs metal framing on new industrial building.
By Frank Melo September 25, 2025
Modular steel construction for new facilities minimizes on-site risks and keeps projects moving so operations are completed without costly injuries or delays.
Pre-engineered steel buildings are ideally suited for golf courses
September 17, 2025
When golf courses need more space, they count on our construction team to deliver a building solution that’s affordable and always under par on performance.
Summit Steel Buildings' new office features a nice client sitting area.
By Frank Melo August 12, 2025
Summit Steel Buildings marks a milestone with its new sales and administration office for the Ontario region located outside London.